skip to main | skip to sidebar

Station Road

Sunday, November 12, 2006

05.11.06 The Front Bedroom, Top Floor

















The top floor, front bedroom has been painted. There are bits which have been sanded down. We just need the air conditioning system in and then we can plaster the en suite.
Posted by Station Road at 12:21 am

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2009 (12)
    • ►  November (7)
    • ►  October (1)
    • ►  July (1)
    • ►  June (1)
    • ►  April (2)
  • ►  2008 (9)
    • ►  November (2)
    • ►  May (6)
    • ►  April (1)
  • ►  2007 (52)
    • ►  October (1)
    • ►  September (2)
    • ►  July (3)
    • ►  May (1)
    • ►  March (14)
    • ►  February (13)
    • ►  January (18)
  • ▼  2006 (113)
    • ►  December (16)
    • ▼  November (14)
      • 28.11.06 More Woodwork
      • 27.11.06 The Living Room
      • 20.11.06 Inside Toilet
      • 19.11.06 The Central Heating
      • 18.11.06 Central Heating
      • 16.11.06 Plumbing
      • 17.11.06 The Hatch
      • 17.11.06 The Staircase
      • 11.11.06 Finishing Touches
      • 10.11.06 Plastering
      • 06.11.06 The Back Bedroom, Top Floor
      • 05.11.06 The Front Bedroom, Top Floor
      • 04.11.06 The Front Garden
      • 03.11.06 Plastering
    • ►  October (10)
    • ►  September (11)
    • ►  August (13)
    • ►  July (16)
    • ►  June (9)
    • ►  May (24)

About Me

Station Road
We decided in March 2006 to buy a house. We found this one on Station Road in Bawtry which was built in 1809. It needed major renovations. This is our story.
View my complete profile