skip to main | skip to sidebar

Station Road

Sunday, March 11, 2007

09.03.07 The En Suite



Is now finished! The shower no longer leaks so we can now have the carpet put down in both bedrooms.
The skirting boards have been fitted and the macerator has been boxed in.
Posted by Station Road at 9:26 pm

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2009 (12)
    • ►  November (7)
    • ►  October (1)
    • ►  July (1)
    • ►  June (1)
    • ►  April (2)
  • ►  2008 (9)
    • ►  November (2)
    • ►  May (6)
    • ►  April (1)
  • ▼  2007 (52)
    • ►  October (1)
    • ►  September (2)
    • ►  July (3)
    • ►  May (1)
    • ▼  March (14)
      • 26.03.07 Ramblings
      • 26.03.07 Third Floor, Front Bedroom
      • 26.03.07 Third Floor, Back Bedroom
      • 23.03.07 The Bathroom
      • 18.03.07 The Bathroom
      • 13.03.07 Woodwork
      • 11.03.07 The Bathroom
      • 10.03.07 Our Home!
      • 10.03.07 The Electrics
      • 09.03.07 The En Suite
      • 09.03.07 The Bathroom
      • 05.03.07 The Bathroom
      • 03.03.07 The Bathroom
      • 02.03.07 The Bathroom
    • ►  February (13)
    • ►  January (18)
  • ►  2006 (113)
    • ►  December (16)
    • ►  November (14)
    • ►  October (10)
    • ►  September (11)
    • ►  August (13)
    • ►  July (16)
    • ►  June (9)
    • ►  May (24)

About Me

Station Road
We decided in March 2006 to buy a house. We found this one on Station Road in Bawtry which was built in 1809. It needed major renovations. This is our story.
View my complete profile